Back

Mechanical, electrical and instrumental construction of 11 gas turbines

Client
GE Power
Scope of work
Mechanical and electrical installation of 11 LM2500Xpress gas turbines.
Resources
180
Technical details

Assembly of DVGW-certified piping, 2000 tonnes of equipment and 55 tonnes of interconnecting piping, insulation and painting. Laying of 130 km of electrical cables.