Mechanical, electrical and instrumental construction of 11 gas turbines

Client
GE Power
Scope of work
Mechanical and electrical installation of 11 LM2500Xpress gas turbines.
Resources
180
Technical details

Assembly of DVGW-certified piping, 2000 tonnes of equipment and 55 tonnes of interconnecting piping, insulation and painting. Laying of 130 km of electrical cables.