Prefabrication and mechanical assembly Small Scale LNG

Client
PIR/Edison
Scope of work
Prefabrication and assembly of piping and structurework for the first small-scale LNG depot in Italy.
Resources
50
Technical details

Approximately 100 tonnes of piping (SS+CS) prefabricated and installed corresponding to almost 20,000 inches of welding. Including painting, insulation and testing services.