Scope of work EPC contract for the installation of a steam turbine at the Mantua Refinery
Resources 100
Technical details
Prefabrication and assembly of 30 tonnes of piping. Installation of 182 valves and 37 tonnes of structures. Laying of 15 km of electrical cables. Plant commissioning and start-up.