Gas Turbine Mechanical Installation

Client
Saipem
Scope of work
Expansion of the existing 300 MW power plant through the mechanical installation of a 150 MW AE94.2 gas turbine.
Resources
260
Technical details

Assembly of DVGW-certified piping, 2000 tonnes of equipment and 55 tonnes of interconnecting piping, insulation and painting. 130 km of electrical cables laid.