Removal of 50 km of cable, laying of 1 km of main and secondary footbridge, laying of 40 km of electrical cables, laying of 42 km of instrument cables, calibration and laying of 218 instruments, termination and connection to terminals of 928 cables. Pre-commissioning and assistance with commissioning activities.