Scope of work Expansion of the existing 300 MW power plant through the mechanical installation of a 150 MW AE94.2 gas turbine.
Resources 260
Technical details
Assembly of DVGW-certified piping, 2000 tonnes of equipment and 55 tonnes of interconnecting piping, insulation and painting. 130 km of electrical cables laid.